Case Study: Tower Bridge

 

 

 

We carried out the installation of theatre style lighting controls and distribution as part of the Tower Bridge Experience, Audio Visual presentation. The presentation is located at the 4th floor of the North Tower of Tower Bridge.

Finished on time and within budget. Well done MAC Services electrical team.

Work:

– The supply, construction, installation and wiring of a 20 way marhalling box, consisting of an enclosure, SIN rail and fixed connectors of 2.5 mm2 capacity.

– The supply and installation of a single pole 40amp MCB within the existing distribution board and a new 40amp mains supply to the existing ILight dimmer.

– The supply and installation of 4 n.16amp MCBs within the exstisting distribution board and associated wiring.

– An extension to the existing Unistruct mounting frame.

 

Advertisements

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Google+ photo

You are commenting using your Google+ account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

w

Connecting to %s